You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Domino-kortteli Residential Complex, Finland

Информация за проекта

Местоположение: Sipoo, Финландия

  • Residential complex consisting of 2 buildings with up to 6 storeys, and designed to provide a living environment to suit senior citizens

Изисквания

  • Maintaining a very tight construction schedule
  • Realizing the walls using on-site concrete construction at sub-zero temperatures
  • Efficient and accurate pouring times without any frost damage
  • Minimization of working times particularly for the slab formwork

Клиент

Contractor
Joint Venture TYL Onnenrakentajat,
Helsingin Rakennusteho Oy and Keski-Suomen Betonirakenne Oy

Subcontractor
AT Complex Oy

Field Service
PERI Suomi Ltd Oy

Информация за клиента

  • Maintaining the extremely tight schedule
  • Extended concreting operations, uninterrupted pouring cycles even during sub-zero temperatures due to the heat supply
  • Efficient and accurate pouring without any frost damage at low temperatures
  • High level of working safety with the MXK Bracket System
  • Economical solution for forming the walls as MAXIMO can be used in both summer and winter
  • Fast forming of the slabs through the simple, systematic assembly sequence and low number of slab props
  • Accelerated construction progress due to the possibility of early striking of the slabs and reduced on-site material requirements
  • Simplified and fast logistics on the jobsite through easy to handle and lightweight SKYDECK System components
Picture of Jari Juntunen, Site Manager, Keski-Suomen Betonirakenne Oy
Jari Juntunen
Site Manager (Keski-Suomen Betonirakenne Oy)

Not only in winter is it important to choose the right formwork solution because the Finnish climate can lead to challenges all the year round. The new PERI solution allows summer and winter use with only one formwork system. The MAXIMO elements are simply supplemented with heating elements and the heat supply ensures an uninterrupted hydration process – the right solution for concreting at low temperatures. For us, it is important to work with high-quality systems every day. Using MAXIMO MXH was well worth it and the system has more than justified its reputation.

PERI решение

  • Supporting the construction team already in the planning phase with a comprehensive formwork solution
  • Heatable formwork for constructing the walls using on-site concreting operations during winter
  • Early striking with SKYDECK Panelized Slab Formwork
  • Professional on-site instruction and support provided by an experienced PERI supervisor
  • PERI-supported project management and logistics