You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Traffic junction Czerniakowska, Poland

Информация за проекта

Местоположение: Warsaw, Полша

  • length/height viaduct CE-2: 430 m / 11.90 m
  • length/height viaduct CE-3: 600 m / 14.60 m
  • structure: superstructure as pre-stressed hollow box

Изисквания

  • high requirements concerning form and concrete surfaces of the viaduct pillars
  • undisturbed flow of traffic during the complete construction time

Клиент

Consortium DROMEX S.A. - Mostostal Warszawa S.A. / WARBUD S.A. / KPRM SKANSKA S.A.

Информация за клиента

  • smooth construction sequence
  • undisturbed flow of traffic
Sławomir Ramski | Piotr Kolasa
Construction Manager KPRM | Construction Manager WARBUD

PERI has supplied a perfect solution for bypassing the road with its ongoing traffic. You can completely rely on PERI, 100% – and if necessary, the PERI specialists even come to the jobsite at night or on Sundays and bank holidays.

PERI решение

  • viaduct pillars with VARIO GT 24 and TRIO wall formwork and SRS steel circular column
  • superstructure with VARIO GT 24 wall formwork and MULTIFLEX slab formwork
  • support via portal-type shoring structure with HD 200 heavy-duty props
  • reliable material logistics as well as continuous support during the construction time