Stadtquartier Hirschgarten MK4 „Friends“, Germany

Информация за проекта

Местоположение: Munich, Германия

Complex of buildings close to Munich’s city center, with 260 apartments as well as office and hotel units, hallmarked by two 16-floor residential towers with a height of 53 m each.

Seemingly irregularly arranged triangular oriels characterize the outer facade of the two residential towers.

Изисквания

  • Requirement of short construction time: 12 months for 40,000 m³ of concrete and 5,700 tons of structural steel
  • Work safety was of upmost importance
  • Taking into consideration the triangular oriels that formed cantilevers of 1.20 m
  • Outer walls to be built as water-impermeable structure

Клиент

Hochtief Building GmbH, Munich

Информация за клиента

  • Safe and efficient working without additional facade scaffolding
  • Fast shuttering times for slabs due to large-size movable VARIODECK edge tables and lightweight SKYDECK elements
  • Short construction time for walls and columns through tie technology of the MAXIMO wall formwork which can be operated from one side and due to the QUATTRO column formwork which can be completely moved in one unit
Picture of Tobias Knappke, site manager at Hochtief Building GmbH, Munich
Tobias Knappke
Site Manager

Workplace safety has always had the highest priority for us. Thus, the VARIODECK Edge Tables, including the anti-fall protection, as well as the PROKIT Edge Protection was a safe solution for all site personnel involved in the construction work, and also led to a positive overall impression of the jobsite. And with the one-sided MAXIMO tie operations, we could realize the bulk of the reinforced concrete walls in a short construction period.

PERI решение

  • Slab table solution with large-size, customized, 6 meter long VARIODECK edge tables and system-integrated 3-part side protection
  • PROKIT side protection to secure the building edge of all completed shell structure floors
  • RCS MP landing platforms mounted to form a cantilever, used as a temporary storing area and for the easy moving of loads by crane
  • Sealing of the outer walls with MX screw plugs