Terminal Building, Gazenica Passenger Port, Zadar, Croatia

Информация за проекта

Местоположение: Zadar, Хърватска

  • Construction of a new passenger and ferry terminal in the port of Gazenica in Zadar
  • Two-storey terminal building on a total area of 25,000 m²

Изисквания

  • High demands placed on work safety and surface quality
  • Complex building geometry with large slab heights
  • V-shaped circular columns with diameters up to 100 cm

Клиент

General Contractor

STRABAG d.o.o. Zagreb, Croatia, Department MU-CC

Информация за клиента

  • Fast construction progress due to a coordinated scaffolding and formwork solution
  • Safe and time-saving execution
  • Punctual delivery of large quantities of materials
  • Fast forming of the foundations and side walls of the beams without requiring a crane through the use of DUO Lightweight Formwork
  • Savings of valuable working time due to the possibility of moving large-sized TRIO formwork units with the crane
  • Flexible slab formwork solution also with large supporting heights
  • Reduced on-site material requirements due to the early striking possibility of the SKYDECK Panel Slab Formwork
Portrait of Marko Rados, Project Manager at STRABAG d.o.o. Zagreb, Croatia, Department MU-CC
Marko Rados
Project Manager

For such a large project, PERI provided us with an ideal combination of systems that allowed us to achieve outstanding quality using safe working conditions. We have been working together with PERI for many years now and the collaboration this time once again resulted in optimal technical solutions as well as punctual deliveries of large quantities of materials to the site. In spite of the large supporting heights, we are extremely satisfied with the construction progress.

PERI решение

  • Planning and delivery of a comprehensive formwork and scaffolding solution from a single source
  • Customized PERI SRS Circular Column Formwork for the construction of columns with diameters of 95 cm and 100 cm
  • Construction comprised of SRU Steel Walers and Heavy-Duty Spindles taken from the VARIOKIT Engineering Construction Kit for supporting the 60-degree inclined column formwork
  • PERI UP Flex shoring as a working platform, flexibly adapted in the 25 cm system grid to accommodate the diagonally-arranged circular columns
  • TRIO Column Formwork for the construction of squared-shape columns
  • MULTIFLEX Girder Slab Formwork flexibly adapted to suit the specific building construction through the use of selected girder combinations as well as a free choice of girder arrangement